Pompano Beach Pool Permit Guide

New swimming pools in the City of Pompano Beach are permitted through the Building Inspections Division of the Department of Development Services. This guide summarizes the city’s new pool checklist, Pool Safety Act form, fee schedule, and permit process, with a link to each document so you can check it yourself.

Last checked against official sources on November 11, 2026 · Permitting authority: City of Pompano Beach Department of Development Services — Building Inspections Division · 954-786-4669

When is a permit required?

  • The construction of a new swimming pool requires a permit.[1]
  • The checklist calls for Building, Electrical, Plumbing, and Zoning Compliance applications, a Tree Permit Application where trees are impacted, and a Fire Plan Review Application for multi-family, commercial, and condominium projects.[1]

What to submit

  • Building, Electrical, Plumbing, and Zoning Compliance applications.[1]
  • A site plan, electrical plan, pool plan, piping diagram, and construction details.[1]
  • A signed and sealed geotechnical/subsoil report, and a Special Inspector Form if required.[1]
  • The completed Pool Safety Act form (Residential Swimming Pool, Spa and Hot Tub Safety Act Notice of Requirement), signed by the owner/agent and the contractor, identifying the safety method or methods: an ASTM F1346 safety cover, a child barrier, non-dwelling walls and fences, exit alarms, self-latching doors with latches at least 54 inches above the threshold, or an ASTM F2208 pool alarm.[1],[2]
  • If applicable: gas piping plans with isometric drawings, BTU loads, and manufacturer specifications for heaters or heat pumps.[1]
  • A Tree Permit Application if the work impacts trees, and a Fire Plan Review Application for multi-family, commercial, and condominium projects.[1]
  • Florida law requires a copy of the recorded Notice of Commencement to be filed with the building department before the first inspection when the direct contract is greater than $5,000. The building department may not require it as a condition of applying for or issuing the permit.[3]

Fees

As published in the city’s fee schedule. Confirm the final amount at submittal — other fees can apply depending on scope.

Building permit — project value up to $250,000 (without zoning review)2.75% of value[4]
Building permit — project value up to $250,000 (with zoning review)1.65% of value, plus Zoning Compliance Permit fees per the zoning fee schedule[4]
Re-review of plans$100 per hour per plan reviewer[4]

How review works

  1. Submit the application

    Applications go in through the City’s ePlan portal. The city’s permit process chart also shows paper and permit-expeditor submittals.[6],[5]

  2. Trade review

    Not every permit is reviewed by every trade — the Building Division tells applicants which trades must review based on the scope. The city’s permit process chart lists pools among the work that requires structural, plumbing, zoning, and electrical review.[5]

  3. Corrections and resubmittal

    If corrections are required, you resubmit corrected plans. Each additional round adds processing time, and re-review fees may apply. The city’s process chart notes a 60-day time limitation, after which the application becomes null and void.[5],[4]

  4. Pay fees and obtain the permit

    Once approved and fees are paid, the permit is issued.[5]

  5. Inspections

    The checklist lists pool inspections (BLDG SOIL COMPACTION, BLDG POOL STEEL, BLDG POOL BARRIER, BLDG ENGINEER REPORTS, BLDG FINAL STRUCTURAL), electrical inspections (underground wiring/piping, pool light potting compound, pool bonding, pool deck bonding, pool exit alarm, final), plumbing inspections (pool main drain, pool perimeter piping, final), a zoning final, and tree inspections. The final inspection will not be approved without compliance with the pool safety requirements.[1]

Frequently asked questions

Do I need a permit to build a pool in Pompano Beach?

Yes. The construction of a new swimming pool requires a permit, with Building, Electrical, Plumbing, and Zoning Compliance applications, plus tree and fire review where they apply.

What pool safety barrier do I need?

You choose one or more methods on the city’s Pool Safety Act form: an ASTM F1346 safety cover, a compliant child barrier, non-dwelling walls and fences around the pool, exit alarms on dwelling openings, self-latching doors with latches at least 54 inches above the threshold, or an ASTM F2208 pool alarm. The final inspection won’t be approved without compliance.

What inspections does a new pool need?

The city’s checklist lists building inspections (soil compaction, pool steel, pool barrier, engineer reports, final structural), electrical inspections (underground wiring, light potting compound, pool and deck bonding, exit alarm, final), plumbing inspections (main drain, perimeter piping, final), a zoning final, and tree inspections.

Do I need a geotechnical report for a pool?

Yes. The checklist requires a signed and sealed geotechnical/subsoil report, plus a Special Inspector Form if required.

Official sources

  1. Permit Checklists — Swimming Pool (New)City of Pompano Beach, Building Inspections Division · Last updated 5/14/2026
  2. Residential Swimming Pool, Spa & Hot Tub Safety Act; Notice of RequirementCity of Pompano Beach, Building Inspections Division
  3. Florida Statutes §713.135 — Notice of commencement and applicability of lienThe Florida Legislature · 2026 Florida Statutes
  4. Building Department Fee ScheduleCity of Pompano Beach Building Department · Updated 2/10/26
  5. Department of Development Services: Permit ProcessCity of Pompano Beach
  6. House Bill 803: Building Permit Exemption for Projects Under $7,500City of Pompano Beach, Development Services

Ask Kodie

Have a question about your pool permit in Pompano Beach? Kodie answers from verified Florida Building Code and local requirements, with citations — or upload your plans for a pre-submittal review.

Ask Kodie

Stuck or rejected? We’ll handle it

We prepare, file, and track permits in Pompano Beach through to issuance — and take over permits already stuck in review.

Get permit help

This guide summarizes publicly available documents from the permitting authority and is not legal or code advice. Requirements change — always confirm against the current documents linked above and with the building department before you submit. Florida Construction Permitting is a private permit expediting service and is not affiliated with City of Pompano Beach Department of Development Services.