The parts of a submittal that quietly cost you weeks.
Jurisdiction-specific submittal requirements
Every building department wants the package its own way — sheet order, digital signature format, separate trade applications, and its own checklist. We file to the local standard, not a generic one.
Notice of Commencement
Prepared, notarised, and recorded with the Clerk of Court, then filed into the permit record where the jurisdiction expects it.
Product approval & NOA packages
Florida Product Approval numbers and Miami-Dade NOAs pulled, checked against the design pressures on your plans, and compiled with the installation details reviewers ask for.
Forms and applications
Permit applications, owner-builder and subcontractor affidavits, energy and truss documents, and the trade forms that ride along — completed and signed in the right order.
Resubmittals and comment responses
A written response to every comment, cross-referenced to the revised sheet, so the reviewer can clear the item without hunting for what changed.
Permit status tracking
We monitor the portal, keep a record of where each review sits, and tell you what is actually holding it up rather than that it is "in review".
Early start permits
Where the jurisdiction allows work to begin ahead of the full permit — Broward FBC Ch.1 §105.12 and the equivalent local processes — we assemble what the early start hangs on: the recorded Notice of Commencement, environmental and transportation sign-offs, and an asbestos certificate where the scope calls for one. It is conditional approval, not a shortcut around review, and it only holds if the paperwork behind it is clean.
Certificate of Occupancy
Closing the permit out, which is where a lot of jobs quietly stall. We schedule and chase the final inspections across every trade, collect the as-builts, surveys, and compliance reports the department wants on file, clear whatever is still open in the record, and push it through to CO issuance.
Temporary Certificate of Occupancy
When the job has to open before full closeout is realistic, we put together the partial occupancy package — what is complete, what is not, what life-safety items have to be signed off first — and coordinate the conditions and expiry the building department attaches to it, then keep working the remaining items toward the full CO.